1917 Craftsman Master Bedroom Remodel
This project entails near complete demolition of a master bedroom, removal of two walls, and addition of two walk-in closets and a fireplace, and retaining most of the square footage of the original room. Tricky indeed. Also removing the old ceiling, adding insulation and moving it up almost two feet. The new ceiling will be vertical grain bamboo plywood. Floors will be carpeted. Walls will be smooth and painted.
Subscribe to:
Post Comments (Atom)
Before Drywall
All outside walls and the ceiling are now insulated. For the past 91 years, they were not.
Ceiling and beams to be covered in VG bamboo.