skip to main
|
skip to sidebar
Fremont Remodel
Thursday, September 25, 2008
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Before Drywall
All outside walls and the ceiling are now insulated. For the past 91 years, they were not.
Ceiling and beams to be covered in VG bamboo.
Bamboo plywood on ceiling
VG Bamboo Ceiling
Hallway Before Drywall
Hallway after drywall, paint, and oak
Onstot Construction
Before
Before
Blog Archive
▼
2008
(10)
▼
September
(7)
No title
No title
No title
No title
No title
No title
Near Completion
►
July
(1)
►
June
(2)
Messy Demo
New ceiling before bamboo.
New Fireplace on South Wall. Walk-in closets on either side. Large storage space behind closet.
Fireplace and closets. Closets lined with aromatic cedar.
Fireplace with leather in place.
No comments:
Post a Comment